Project Information
Project NameProject 6
Transport & Main Roads Details
Principal Contractor Details
Audit Details
1. General and Administrative Requirements
1.1 A WHS management plan has been prepared for the workplace and has been completed by the principal contractor prior to work on the project commencing
Document Page Number Section Ratings
Select One
1.2 The plan includes details for the construction project that define the workplace, including:
Document Page Number Section Ratings
Select One
1.3 For each worker involved in the project whose role includes health and safety responsibilities, the plan includes their name, position, and specific health and safety responsibilities
Document Page Number Section Ratings
Select One
1.4 The plan describes a process for reviewing and, if necessary, updating the plan to ensure it remains up to date
Document Page Number Section Ratings
Select One
2. Consultation, Cooperation and Coordination
2.1 The plan outlines how the contractor will consult, cooperate and coordinate with other duty holders on site
Document Page Number Section Ratings
Select One
2.2 The plan describes how consultation will be carried out with workers
Document Page Number Section Ratings
Select One
2.3 Consultation carried out under the plan includes:
Document Page Number Section Ratings
Select One
2.4 The plan outlines when consultative processes will be carried out
Document Page Number Section Ratings
Select One
2.5 The plan includes procedures for the election of HSR
Document Page Number Section Ratings
Select One
2.6 The plan includes procedures for the formation of work groups
Document Page Number Section Ratings
Select One
2.7 The plan outlines how HSR will be included in consultation activities
Document Page Number Section Ratings
Select One
3. Managing Work Health and Safety Incidents
3.1 The plan describes how a copy of the plan will be kept for the duration of the construction project or, in the event of a notifiable incident, for a period of at least 2 years
Document Page Number Section Ratings
Select One
3.2 The plan includes arrangements for managing work health and safety incidents, including managing investigations and notifying the relevant regulator when appropriate
Document Page Number Section Ratings
Select One
3.3 The emergency management plan identifies how communications shall be maintained
Document Page Number Section Ratings
Select One
3.4 The emergency management plan identifies that emergency drills / scenario enactments shall be undertaken annually, and outcomes reviewed.
Document Page Number Section Ratings
Select One
3.5 The emergency management plan identifies a planning process
Document Page Number Section Ratings
Select One
3.6 The emergency management plan identifies potential emergencies
Document Page Number Section Ratings
Select One
3.7 The emergency management plan identifies responsibilities of relevant persons
Document Page Number Section Ratings
Select One
3.8 The emergency management plan identifies relevant emergency contacts
Document Page Number Section Ratings
Select One
3.9 The emergency management plan identifies appropriate emergency procedures
Document Page Number Section Ratings
Select One
3.10 The emergency management plan identifies appropriate rescue procedures
Document Page Number Section Ratings
Select One
4. Provision of information, training, and instruction
4.1 The plan includes any site-specific health and safety rules for the construction project
Document Page Number Section Ratings
Select One
4.2 The plan describes a procedure for ensuring all persons at the workplace are informed of any site-specific health and safety rules
Document Page Number Section Ratings
Select One
4.3 The plan includes procedures for informing all construction workers of the content of the plan and any updates to the plan
Document Page Number Section Ratings
Select One
4.4 The plan describes how workers will be provided with suitable and adequate information, training, and instruction on:
Document Page Number Section Ratings
Select One
4.5 The plan includes provisions for ensuring workers are competent to perform their respective roles and tasks
Document Page Number Section Ratings
Select One
5. SWMS
5.1 A safe work method statement has been or will be prepared for each activity defined as high-risk construction work
Document Page Number Section Ratings
Select One
5.2 The plan includes a procedure for ensuring that SWMS are or will be prepared prior to any high-risk construction work commencing
Document Page Number Section Ratings
Select One
5.3 Each safe work method statement identifies the high-risk construction work to which it applies
Document Page Number Section Ratings
Select One
5.4 Each safe work method statement identifies the foreseeable hazards and risks
Document Page Number Section Ratings
Select One
5.5 Each safe work method statement identifies the control measures to be implemented
Document Page Number Section Ratings
Select One
5.6 Each safe work method statement describes how control measures are to be implemented, monitored, and reviewed
Document Page Number Section Ratings
Select One
5.7 The plan includes a procedure for ensuring the relevant workers and HSR are consulted in the preparation of the safe work method statement
Document Page Number Section Ratings
Select One
5.8 Each safe work method statement that is available has been set out and expressed in a way that is readily accessible and understandable to the workers that will be required to use it
Document Page Number Section Ratings
Select One
5.9 The plan includes a procedure for ensuring high risk construction work is carried out in accordance with the relevant safe work method statement
Document Page Number Section Ratings
Select One
5.10 The plan includes a process for ensuring workers are aware of, trained in, and understand the contents of SWMS
Document Page Number Section Ratings
Select One
5.11 The plan includes a process for consulting, cooperating, and coordinating with other contractors (e.g. subcontractors) to ensure SWMS are in prepared, communicated, implemented, and monitored
Document Page Number Section Ratings
Select One
5.12 The plan includes a process for reviewing SWMS and, where relevant, updating control measures
Document Page Number Section Ratings
Select One
5.13 The plan describes how SWMS will be kept for the duration of the construction project or, in the event of a notifiable incident, for a period of at least 2 years
Document Page Number Section Ratings
Select One
6. Facilities and the work environment
6.1 The facilities planned for the construction workplace are appropriate to:
Document Page Number Section Ratings
Select One
6.2 The first aid provisions planned for the construction workplace are appropriate to the:
Document Page Number Section Ratings
Select One
6.3 Points of entry and exit to the site have been planned to eliminate or minimise the risks to workers and others
Document Page Number Section Ratings
Select One
6.4 A safe system for the collection, storage, and disposal of excess or waste materials is planned for the site
Document Page Number Section Ratings
Select One
6.5 Appropriate provisions have been made for the assessment and mitigation of other potential work environment hazards, including:
Document Page Number Section Ratings
Select One
6.6 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out:
Document Page Number Section Ratings
Select One
6.7 An appropriate emergency plan exists for the workplace
Document Page Number Section Ratings
Select One
7. Falls
7.1 All fall hazards reasonably likely to cause injury has been identified and provisions have been made to manage the associated risks
Document Page Number Section Ratings
Select One
7.2 SWMS have been prepared, or provisions have been made to ensure they will be prepared before the work commences, for any work carried out at a height of 2m or more
Document Page Number Section Ratings
Select One
7.3 For work at a height of 2m or more, where the safe work method statement identifies that the only control measures to be implemented will be administrative or personal protective equipment, the statement also describes all of the control measures that were considered
Document Page Number Section Ratings
Select One
7.4 The control measures planned to manage the risks associated with fall hazards comply with the hierarchy described in the regulations:
Document Page Number Section Ratings
Select One
7.5 Where a fall arrest system is planned as a control measure, emergency and rescue procedures have been prepared and documented
Document Page Number Section Ratings
Select One
8. Falling Objects
8.1 All falling object hazards reasonably likely to cause injury have been identified and provisions have been made to manage the associated risks
Document Page Number Section Ratings
Select One
8.2 The control measures planned to manage the risks associated with falling object hazards comply with the hierarchy described in the regulations:
Document Page Number Section Ratings
Select One
9. Hazardous Substances
9.1 A hazardous chemicals register has been developed for the project and includes all hazardous chemicals that are planned to be used, handled, or stored at the workplace
Document Page Number Section Ratings
Compliant
9.2 The hazardous chemicals register includes a current safety data sheet for each hazardous chemical listed
Document Page Number Section Ratings
NCR
9.3 Provisions have been made to ensure the hazardous chemicals register is available to the relevant workers and anyone else likely to be affected by the hazardous chemicals
Document Page Number Section Ratings
Select One
9.4 The plan includes provisions for managing the risks associated with the use, handling, generation, and storage of hazardous chemicals
Document Page Number Section Ratings
Select One
9.5 The provisions for managing the risks associated with hazardous chemicals described in the plan include procedures for the review of control measures, as per the regulations
Document Page Number Section Ratings
Select One
10. Asbestos
10.1 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work that will involve, or is likely to involve, the disturbance of asbestos
Document Page Number Section Ratings
Select One
10.2 The plan includes provisions for ensuring a competent person identifies all asbestos or asbestos containing materials at the workplace
Document Page Number Section Ratings
Select One
10.3 If required under a regulation, an asbestos register has been prepared
Document Page Number Section Ratings
Select One
10.4 The plan includes provisions for the review of the asbestos register in accordance with the regulations
Document Page Number Section Ratings
Select One
10.5 The plan includes provisions for ensuring workers, HSR, and subcontractors carrying out work at the workplace have ready access to the asbestos register
Document Page Number Section Ratings
Select One
10.6 Where asbestos is known to be or will be at the workplace, a written asbestos management plan has been prepared for the workplace
Document Page Number Section Ratings
Select One
11. Demolition
11.1 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work involving the demolition of an element of a structure that is load bearing or otherwise related to the physical integrity of the structure
Document Page Number Section Ratings
Select One
11.2 Where required under the regulations, written notice providing notification of demolition work has been provided to the regulator at least five (5) days prior to the demolition work commencing
Document Page Number Section Ratings
Select One
12. Safe Use and Storage of Plant
12.1 All hazards associated with plant, including mobile plant, that will be used or stored at the workplace have been identified and provisions have been made to manage the associated risks
Document Page Number Section Ratings
Select One
12.2 Provisions have been made to ensure that, so far as reasonably practicable, unauthorised alterations or interference with plant that will be used or stored at the workplace will be prevented
Document Page Number Section Ratings
Select One
12.3 Provisions have been made to ensure that:
Document Page Number Section Ratings
Select One
12.4 Procedures have been developed to ensure that, so far as reasonably practicable, plant that is not in use will be left in a state that does not create a risk to the health or safety of any person
Document Page Number Section Ratings
Select One
12.5 Provision have been made to ensure that the maintenance, inspection, and testing of plant, including mobile plant, is carried out by a competent person and that records are available
Document Page Number Section Ratings
Select One
12.6 Provisions have been made for the recording of all tests, inspections, maintenance, commissioning, decommissioning, dismantling, and alteration of registered plant, including mobile plant, to be stored or used at the workplace
Document Page Number Section Ratings
Select One
12.7 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out in an area where there is the movement of powered mobile plant
Document Page Number Section Ratings
Select One
13. Scaffolding
13.1 The plan includes provisions to ensure that scaffolding is installed and constructed having regard to the information provided by the designer, manufacturer, importer or supplier of the plant, or a competent person
Document Page Number Section Ratings
Select One
13.2 The plan includes provisions for ensuring that any person who installs, assembles, constructs, commissions or decommissions, or dismantles scaffolding is a competent person
Document Page Number Section Ratings
Select One
13.3 The plan includes provisions for ensuring that scaffolding is not used until written confirmation is received from a competent person stating the construction of the scaffold has been completed
Document Page Number Section Ratings
Select One
13.4 The plan includes provisions for ensuring that scaffolding and any supporting structures are inspected by a competent person:
Document Page Number Section Ratings
Select One
13.5 The plan includes provisions for ensuring that unauthorised access to the scaffold is prevented while the scaffold is incomplete or unattended
Document Page Number Section Ratings
Select One
13.6 Provisions have been made to ensure that, so far as reasonably practicable, unauthorised alterations or interference with scaffolding that will be used or stored at the workplace will be prevented
Document Page Number Section Ratings
Select One
13.7 Procedures have been developed to ensure that, so far as reasonably practicable, scaffolding that is not in use will be left in a state that does not create a risk to the health or safety of any person
Document Page Number Section Ratings
Select One
13.8 Provisions have been made for the recording of all tests, inspections, maintenance, commissioning, decommissioning, dismantling, and alteration of scaffolding to be stored or used at the workplace
Document Page Number Section Ratings
Select One
14. Excavations and Underground Essential Services Information
14.1 All hazards associated with excavation work that will be carried out at the workplace have been identified and provisions have been made to manage the associated risks
Document Page Number Section Ratings
Select One
14.2 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out in or near:
Document Page Number Section Ratings
Select One
14.3 For any area where excavation work will be carried out, including adjacent areas, either:
Document Page Number Section Ratings
Select One
14.4 The plan describes how underground essential services information will be communicated to any person engaged to carry out the excavation work
Document Page Number Section Ratings
Select One
15. Confined Spaces
15.1 All hazards associated with confined spaces have been identified and provisions have been made to manage the associated risks
Document Page Number Section Ratings
Select One
15.2 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out in or near a confined space
Document Page Number Section Ratings
Select One
15.3 The plan includes provisions for the management and issue of confined space entry permits
Document Page Number Section Ratings
Select One
15.4 The plan includes a procedure for ensuring confined spaces are signed in accordance with the regulations
Document Page Number Section Ratings
Select One
15.5 The plan includes provisions for ensuring appropriate communication and safety monitoring for workers entering a confined space
Document Page Number Section Ratings
Select One
16. Public Access and Workplace Security
16.1 The plan includes provisions for ensuring, so far as is reasonably practicable, that the workplace is secured from unauthorised access
Document Page Number Section Ratings
Select One
17. Licenses
17.1 All high-risk work activities for which a high-risk work licence is required under the regulations has been identified
Document Page Number Section Ratings
Select One
17.2 The plan includes provisions for ensuring that workers carrying out high risk work hold the appropriately high-risk work licence or are otherwise permitted under a regulation to carry out the high-risk work
Document Page Number Section Ratings
Select One
18. Traffic Management
18.1 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out on, in or, adjacent to a road, railway, shipping lane, or other traffic corridor that is in use by traffic other than pedestrians
Document Page Number Section Ratings
Select One
19. Electricity
19.1 SWMS have been prepared, or provisions have been made to ensure they will be prepared, for any work carried out on or near energised electrical installations
Document Page Number Section Ratings
Select One
20. NHVR Chain of Responsibility
20.1 Hazard identification and risk analysis
20.2 Management of compliance through the CoR management plan
20.3 Reporting on hazards, occurrences and contraventions
20.4 Organisation chart showing CoR responsibilities
20.5 Resource Management
20.6 Communication Protocols
20.7 Managing interfaces with other stakeholders, suppliers and subcontractors
20.8 Dealing with relevant regulators and authorities; required permits and approvals
20.9 Safety Metrics for CoR
Ratings
Compliant0
Opportunity for Improvement0
NCR0
Unable to verify0
N/A0
Section Break